Doris Dam Slide Gates and Rip Rap Armor – Design Build


MJ Hughes first completed the owner’s 30% design then we replaced failing slide gates and added keyed rip rap slope protection along the outfall of the dam.

MJ Hughes also provided design and installation of Waterman slide gates.

Project Team and Stats:

Location: Alturas, California
Cost: 240,832
Start Date: December 2010
Completion Date: January 2011
Owner: US Fish and Wildlife
Engineer: US Fish and Wildlife
MJ Hughes Project Manager: David Hull
MJ Hughes Superintendent: Jeff Ford
Subcontractors: Eagle Rock Products

   