Blackwell Road Railroad Bridges
This contract replaced two failing bridges. The largest of these is the Blackwell Road Railroad Overcrossing site. The project involved 62,000 cubic yards of embankment, a pre cast box culvert with stream rock and fish habitat placed within, a two span bridge and 41,000 square feet of Mechanically Stabilized Earth Walls. Project Team and Stats:Location: White City, Oregon |
|








